The Purvanchal Expressway

2. The Purvanchal Expressway

Introduction

For the development of remotest eastern region, State Government has decided to develop another Expressway from State Capital (Lucknow) to the Eastern Region via Azamgarh. With the development of this Expressway, the Eastern region of the state would not only be connected to the state capital but also further to the National Capital.

SALIENT FEATURES OF THE PROJECT

STARTING POINT Chand Sarai (District Lucknow) near road cross section constructed along with NH-56.
END POINT Haidaria (District Ghazipur)
HIGHLIGHTS
  • Estimated Total Length - 353.406 kms
  • Estimated Travel Time - 4:30-5:00 Hours
  • ROW - 120 Meters
  • Carriageway - 6 Lane (Expandable to 8 Lanes) but all are structured according to 8 lanes.
  • Provision of Service Road
  • Districts Covered - Lucknow, Barabanki, Faizabad, Ambedkarnagar, Amethi, Sultanpur, Azamagarh, Mau and Ghazipur.
  • Total Access Controlled Expressway
  • Provision for Underpasses for Vehicles, Pedestrians and Animals.
Project Packages The project is proposed to be divided into eight packages.
Link Road The expressway is to be linked with Varanasi through a separate link road.
Mode of Implementation The Project is being implemented on Engineering, Procurement and Construction (EPC) Mode.

Packagewise Project Reports

S. No. Subject Uploading Date Download
EPC-MAIN REPORT-PE-P1 Size: 1.12MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P2 Size: 1.20MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P3 Size: 1.18MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P4 Size: 1.21MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P5 Size: 1.18MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P6 Size: 1.16MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P7 Size: 1.15MB | Lang: English 07/05/18 Click here to download file
EPC-MAIN REPORT-PE-P8 Size: 1.13MB | Lang: English 07/05/18 Click here to download file
Traffic Toll & Financial Studies-PF -P9 Size: 3.59MB | Lang: English 07/05/18 Click here to download file

PROJECT BENEFITS

With the Construction of Purvanchal Expressway, accelerated convenient mode of Transportation shall be available between the Eastern boundary of the State and the National Capital via State capital through other similar Expressways in the State viz. 'Agra to Lucknow Expressway'  and 'Yamuna Expressway'

Being an Access Controlled Expressway, it would provide benefits like fuel saving, time saving and Control in Pollution level, along with reduction in accidents.

The areas covered by this Expressway would be benefited in Social & Economical way. The agriculture, commerce, tourism and other industrial development will also get a fillip.

Industrial Training Institutes, Educational Institutes, Medical Institutes, New Townships and other various Commercial set ups shall be developed, especially near the Expressway areas, which will result into more opportunities for employment in the region. The overall social/economic development in the state will get a boost.

The proposed Expressway will prove to be a catalyst for development of the region and State.

The proposed Purvanchal Expressway getting connected with existing Agra-Lucknow Expressway shall become a vast Industrial Corridor connecting Eastern boundary to Western boundary of the state which will result into overall development of the state.


S. No. Subject Uploading Date Download
Central Lines Coordinates (Packages I to VIII) Size: 290KB | Lang: English 03/02/18 Click here to download file
KMZ File for Packages I 19/02/18 Click here to download file
KMZ File for Packages II 19/02/18 Click here to download file
KMZ File for Packages III 19/02/18 Click here to download file
KMZ File for Packages IV 19/02/18 Click here to download file
KMZ File for Packages V 19/02/18 Click here to download file
KMZ File for Packages VI 19/02/18 Click here to download file
KMZ File for Packages VII 19/02/18 Click here to download file
KMZ File for Packages VIII 19/02/18 Click here to download file