UP Defence Corridor

S. No. Subject Uploaded Date Download
  Defense Industrial Corridor Project Map Size: 387KB 21/01/2020 Click here to download file
  • Nodes, identified for Defense Industrial Corridor: - Agra, Aligarh, Chitrakoot, Jhansi, Lucknow and Kanpur.
  • Proposed land for all 06 nodes:- 5125.348 Hectare.
  • Status of Land:-

Status of identified and acquisitioned land in various nodes of Defense Industrial Corridor till 10.12.2019 is as under:-

Sr. No.

District

Identified Land (In Hect.)

Phase

Recommended land to be purchased/reacquired/transfer for the project (In Hect.)

Allotted Budget (In Crore Rs.)

Total area of land Purchased/ Reacquired /Transferred till 10.12.2019

%age of land Purchased/ Reacquired /Transferred

 

Jhansi

3,025.3480

First Phase

871.4710 358.00 823.6722 94.52%

Second Phase

199.1750 102.7573 51.59%
 

Chitrakoot

500.0000

&

101.2070 50.00 92.5540 91.45%
 

Aligarh

45.8290

&

45.8290 52.31 45.8290 100.00%
 

Kanpur Nagar

217.7009

&

217.7009 175.00 0.0000 0.00%
  Total 3788.8779

&

1435.3829 635.31 1064.8125 74.18%

*Inter departmental transfer of total land of 45.8290 Hect located in village Andla of Tehsil Khair in district Aligarh has been received by UPEIDA from Department of Agriculture and proceedings are in action to provide the land to the Department of Agriculture in turn of the above said land.

Plan of Action:-

  • IIT Kanpur and IIT Kashi Hindu University Varanasi have been approved by Government of Uttar Pradesh for establishment of Centre of Excellence related with Defense Corridor and allotted with the amount of Rs. 2.00 Crore each against total approved amount of Rs. 50.00 Crore and Rs. 69.00 Crore respectively in the financial year 2018-19. Technical institutes have started working for CoE and Utility Certificate has also been made available by above mentioned institutes.
  • A proposal to establish the defense park as a joint venture of UPEIDA and IIT, Kanpur on 30 Acre land proposed in Shivli near the IIT Kanpur has been forwarded to Department of Industrial Development by UPEIDA through a letter dated 03.07.2019.
  • Uttar Pradesh Aero Space and Employment Promotion Policy have been published by Government of Uttar Pradesh with the objective of attracting investments in U.P. Defense Industrial Corridor.
  • Swift action is being taken by UPEIDA regarding publishing of a policy related with allotment of land to the investors in U.P. Defense Industrial Corridor.
  • Interest has been expressed by various companies to establish defense industries at the identified places for U.P. Defense Industrial Corridor.

Uttar Pradesh Defence Industrial Corridor took off to an encouraging start with the announcement of investments worth over Rs. 3700 crore in defence production at the Meet organized at Aligarh on 11 August 2018. Hon’ble Defence Minister, Govt. of India Smt Nirmala Sitharaman said “Instead of using our own production facilities, we are blindly buying from abroad. Prime Minister is of the view...mobilise and activate these units, and link the private sector with them, so that there is a reduction in the import bill." The Govt. of UP vide Industrial Development Department, has nominated UPEIDA (Uttar Pradesh Expressways Industrial Development Authority) as the Nodal Agency for:

  • Land acquisition related works for Defence Corridor
  • Execution, implementation and proprietorship of Defence Corridor through the medium of a Special Purpose Vehicle as per the guidelines of Govt. of India’s Defence Policy.

The Government has identified the following nodes for UP Defence Industrial Corridor:

The Criteria for the Selection of the nodes is as given below:

  • Connectivity (Road, Rail and Air)
    • Agra – Well connected by Rail and Air.
      • Connected to Lucknow by Agra-Lucknow Expressway
      • Connected to Aligarh by NH 509
      • Connected to Jhansi by NH 44
    • Kanpur – Well connected by Rail and Air.
      • Connected to Agra by Agra-Lucknow Expressway
      • Connected to Lucknow by NH 27
    • Chitrakoot – Well connected by Rail. Nearest airport Bamrauli (Prayagraj) 100 km away.
      • Well connected to other nodes by Bundelkhand Expressway
    • Lucknow– Well connected by Air, Rail and Agra-Lucknow Expressway
    • Jhansi – Well connected by Rail. Airport proposed in Jhansi.
      • Connected to Agra by NH 44.
    • Aligarh – Well connected to Delhi and Agra by road. Proposed Airport in Jewar nearby in addition to operational airport at Agra.
  • Enabling Infrastructure (Power, Water, Land)
  • Type of Land
  • Land Cost
  • Demographic Profile

The Authority, in keeping with the importance of the project has procured 590 Ha (approximately 66% of the land) in Jhansi and Chitrakoot.

S. No. Subject Uploading Date View File
  Uttar Pradesh Defence and Aerospace Unit and Employment Promotion Policy (First Amendment 2019) Size: 2.68 MB | Lang: Eng 24-01-2020 Click here to view file
  Guideline / Procedure for Allotment of Industrial Plots
in Defence Corridor, UPEIDA  Size: 3.56MB | Lang: Eng
04-01-2020 Click here to view file
  Guideline / Procedure for Allotment of Industrial Plots
in Defence Corridor, UPEIDA  Size: 958.81 KB | Lang: Eng
18-12-2019 Click here to view file
  MoU STATUS-03FEB202  Size: 206.83 KB | Lang: Eng 14-02-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.62 KB | Lang: Hindi 17-02-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.62 KB | Lang: Hindi 11-02-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.61 KB | Lang: Hindi 27-01-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.61 KB | Lang: Hindi 20-01-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.61 KB | Lang: Hindi 13-01-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.62 KB | Lang: Hindi 07-01-2020 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.70 KB | Lang: Hindi 31-12-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 22.17 KB | Lang: Hindi 16-12-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.75KB | Lang: Hindi 09-12-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.72KB | Lang: Hindi 02-12-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.72KB | Lang: Hindi 26-11-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.56KB | Lang: Hindi 18-11-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.56KB | Lang: Hindi 04-11-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.58KB | Lang: Hindi 30-10-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.67KB | Lang: Hindi 22-10-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.59KB | Lang: Hindi 14-10-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.63KB | Lang: Hindi 09-10-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.53KB | Lang: Hindi 30-09-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.54KB | Lang: Hindi 26-09-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.57KB | Lang: Hindi 25-09-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.5KB | Lang: Hindi 24-09-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 21.5KB | Lang: Hindi 23-09-2019 Click here to view file
  Land Acquisition Details of Defence Corridor- Size: 22.5KB | Lang: Hindi 13-09-2019  Click here to view file
  Visit of High level delegation from Uttar Pradesh to attend the Defence & Security Equipment International (DSEI) in London. - Size: 1.98MB | Lang:English 24-09-2019 Click here to view file
  This policy further being revised with incentives and is under process of approval- Size: 448KB | Lang: Hindi 23-09-2019  Click here to view file
  Draft Guideline / Procedure for Allotment of Industrial Plots in Defence Corridor, UPEIDA- Size: 778KB | Lang: Hindi 23-09-2019  Click here to view file